Hi I want to move the feed to my rads , as the route is too long,this would mean leaving approx 3 m of 22 mm flow and return plpework down beside the chimney breast still inline, and water being fed from 15 mm through 22 mm and back out to 15 mm.would this cause pressure problems or would the plumber have to change the 22 mm to 15 mm ,which is very difficult to access??
 
If your pipe is currently

15----------------15 and you wish to change to 15----15<22=========22>15-------15

this will not cause a problem. In fact, it is better than extending

15----------15 to 15------------------------------------15 as the wider pipe has less resistance to flow for a given length.

Since it sounds like you have pressure drop issues due to long pipe runs, wider is better.

Kind regards.
 

Similar plumbing topics

Replies
19
Views
3K
    • Like
Silly me! I must remember to check the date of...
Replies
5
Views
9K
If this is a set of flats you are probably...
Replies
4
Views
2K
  • Question
If I understand this correctly, what you're...
Replies
3
Views
1K
Thanks, I shall take a look in that case and...
Replies
21
Views
3K
Back
Top