Hugh Harper-Daly
Hi I want to move the feed to my rads , as the route is too long,this would mean leaving approx 3 m of 22 mm flow and return plpework down beside the chimney breast still inline, and water being fed from 15 mm through 22 mm and back out to 15 mm.would this cause pressure problems or would the plumber have to change the 22 mm to 15 mm ,which is very difficult to access??