Hello.
I should know this, but haven't done it in a screed before.
Have one radiator to connect to an existing system for an extension.
The extension has a concrete floor and the pipes to be laid will be buried in screed.
What's the best method to adopt? I was intending to use copper and have thought about what I might be able to sleeve it with.
Any suggestions? Thanks.
I should know this, but haven't done it in a screed before.
Have one radiator to connect to an existing system for an extension.
The extension has a concrete floor and the pipes to be laid will be buried in screed.
What's the best method to adopt? I was intending to use copper and have thought about what I might be able to sleeve it with.
Any suggestions? Thanks.