HI,

just a bit confused what pipework to use, fitting combi boiler in a 3 bedr bungalow. There is not a lot of feedback outhere of people who laid pipework in concrete. Do you use grade X or use grade K, although i think grade K is not available in 15 or 22mm. If grade X is good , do you just wrap the pipework in densotape or what type of lagging would you use. Is there anything else that is of much importance when it comes to bedding pipework in concrete.
Will be starting the job soon, quick reply would be very helpful
Thanks a lot
Pete
 
copper 1057x pipe wrapped in desotape surrounded with a sand bed all round approx 2'' all round with end feed joints only, screeded over with 5/1 sand cement mix.
or 22mm plastic tube shroud barrier.
dont let cement mix come into contact with copper pipe.
 

Similar plumbing topics

There is a lot of work not so much materials...
Replies
25
Views
9K
Don't think that M.valves will pull in air...
Replies
17
Views
4K
    • Like
From this post, I think you’ve got a good...
2
Replies
47
Views
6K
Replies
28
Views
8K
All much of a much, (pretty good) centrifugal...
Replies
3
Views
1K
Back
Top