Work was undertaken in 2017 in which pipework from a new condensing boiler was routed through an external wall and then connected to the existing pipework of the underground copper oil feed pipe.
Should the system be pressure tested after completion.
If so, would it be tested at the oil feed pipe near to the oil tank or at any other location.
Ta very much