Hi All. Do I need to apply plasterboard tape prior to tiling in my bathroom and shower enclosure or can I fill the joints with adhesive or gap filler instead? Any advice much appreciated. Thanks.
I was going to keep the MR plasterboard I've installed and use the Mapei water defence kit, so prime it first then apply the tape during the tanking process?