- Messages
- 165
Hi guys, after an opinion on what looks good and works well.
I have a 1.8 metre towel rail to be fitted in a shower room with a concrete floor. So as the floor is finished I'm bringing my pipes down from upstairs.
I was thinking of bringing both pipes to the bottom of the rail, but do you think it'll look as good with say the lock sheild at the top and (to keep the air bleed at the top) the TRV at the bottom?
I have a 1.8 metre towel rail to be fitted in a shower room with a concrete floor. So as the floor is finished I'm bringing my pipes down from upstairs.
I was thinking of bringing both pipes to the bottom of the rail, but do you think it'll look as good with say the lock sheild at the top and (to keep the air bleed at the top) the TRV at the bottom?