Ive got a job to price for where a builder has left some works un finished and not started
tile en suite floor 1m x 3m
connect basin up
move toilet cold feet to opposite side and fit toilet
connect electric shower up
wire up extractor fan and few other little bits
Full cloak room,
have room fully plastered
box wall out with 3x2 to hide pipes
fit toilet
wall hung basin
tile half height
and have the cardinal flooring layed
All the fixtures flooring and tiles are already on the job
will just need to supply basic materials pipe/fittings silicone/grout and so on
I was thinking £3500-4500 all in
As i'll have to check out the work already completed and will be taking on some risk,
I've already told the customer I can't give any guarantee for any work that's not mine and any faults that arise
2 guys and I think about 10-15 days potentially
tile en suite floor 1m x 3m
connect basin up
move toilet cold feet to opposite side and fit toilet
connect electric shower up
wire up extractor fan and few other little bits
Full cloak room,
have room fully plastered
box wall out with 3x2 to hide pipes
fit toilet
wall hung basin
tile half height
and have the cardinal flooring layed
All the fixtures flooring and tiles are already on the job
will just need to supply basic materials pipe/fittings silicone/grout and so on
I was thinking £3500-4500 all in
As i'll have to check out the work already completed and will be taking on some risk,
I've already told the customer I can't give any guarantee for any work that's not mine and any faults that arise
2 guys and I think about 10-15 days potentially