just seen scotts post and just seen an email from customer
just quoted against two muppets
back boiler to combi (combi going in airing cupboard)
hes suppling the boiler and flue (shitty ideal icos)
remove all the tanks, cylinder and back boiler
new gas run 2 lengths of 22mm tube
boiler flue to go through the old prefab houses (eg concrete siding/panels)
condense is a big run plus you have to make your own entry in to the manhole (3 lengths of 11/2)
flush and chems the system as its back boiler
also first and second fix a basin all in chrome with also an outside tap
2 lengths of 15mm chrome tube
chrome bottle trap etc
price for the above ish will tell you the prices later
just quoted against two muppets
back boiler to combi (combi going in airing cupboard)
hes suppling the boiler and flue (shitty ideal icos)
remove all the tanks, cylinder and back boiler
new gas run 2 lengths of 22mm tube
boiler flue to go through the old prefab houses (eg concrete siding/panels)
condense is a big run plus you have to make your own entry in to the manhole (3 lengths of 11/2)
flush and chems the system as its back boiler
also first and second fix a basin all in chrome with also an outside tap
2 lengths of 15mm chrome tube
chrome bottle trap etc
price for the above ish will tell you the prices later