Hey guys, recently had a bit of a dispute over a quote asking me to break it down etc saying they can buy this from X for Y.. how much is labour/materials.. shockingly it was from friends so it's taken its toll on me mentally if I'm honest.. I'm don't think I'm outrageously pricey but I do a good job and people know that. The job I quoted for is part of a much bigger job that I'm now feeling guilty over making any profit on other than wages whilst drawing up the interim invoice, I asked what the budget was pre starting and they said there isn't, that doesn't mean I've thrown my usual calculation methods out but I've not gone speedfit bonanza either.. I know the general way to work out an hourly rate but that depends on the van you drive etc too, I'm talking for larger jobs too, like this job is 2 bathroom Reno's (1st and 2nd fix, one was a bedroom being converted into a shower room) I've done the stud work for it too, a kitchen 1st and second fix, vented to unvented convert.. rad removals, plus a load of other carpentry related bits.. I'm at a loss as to what's an acceptable day rate, acceptable hourly and acceptable profit margin on larger work plus markup %s, Atm I day rate look for £250 if possible, smaller jobs 60£ first hour then 30£, anything over 5 hours I consider a day really.. markup flat 20% and then say for this job I would do a day rate for the amount of days I think it'll take then add on 20% on labour for the inevitable balls ups which serves as my "profit" if I hit my guesstimated daily allowance. 20% markup materials, I still feel like this only buys me a day or 2 tbh and considering the risk it's quite demotivating. Any advice appreciated, I know this is a hard sum to quantify but just looking for a guideline I can stick to, am I am on the money or am I expensive? I'm based in south east. Cheers