got a chance to tender for my largest project to date, 300m2 domestic new build with underfloor heating, plant room with boiler and unvented cylinder, boosted cold water, all plumbing work and gas work. Its specified a U6 meter but trac pipe of 50mm? no spec for the boiler yet.
I've got the drawings and spec, but was wondering if it would be wiser to have a quantity surveyor price it for me ?
Also, could I get a commercial subby guy on my gas registration to do the gas work?