O
Orry Clayton
Situation
I have Potterton HE24 is at one side of the house, the flow and return lead off for about 5/6 meters to the vented cylinder where the 3 port valve is located, all CH pipe work then comes off this as you would expect.
But, I wanted a radiator in a new part of the house so I came straight off flow and return before the 3 port because I would have meant ripping up most of the house.
Problem I expected
Radiator will be on when I turn HW on. It has a TRV, so no real issue there.
Question
Do you brilliant people, here at UKPF, know of any other issues I may expect to have in the future?
I have Potterton HE24 is at one side of the house, the flow and return lead off for about 5/6 meters to the vented cylinder where the 3 port valve is located, all CH pipe work then comes off this as you would expect.
But, I wanted a radiator in a new part of the house so I came straight off flow and return before the 3 port because I would have meant ripping up most of the house.
Problem I expected
Radiator will be on when I turn HW on. It has a TRV, so no real issue there.
Question
Do you brilliant people, here at UKPF, know of any other issues I may expect to have in the future?