currently working on my bathroom refurb and am after some advice on how best to go about re arranging the following:
Starting from the top:
The sink waste is solvent welded but i can reuse it in its current position
I want to move the toilet to the adjacent wall so id need to move the branch through 90 degrees, can i just twist this round to the required position?
The bidet is being removed permanently
I want to run the shower waste under the floor boards.
The existing shower waste is solvent welded into the branch.
The bidet waste is push fit.
Can i cut an cap off the shower below floor board level and re-use the push fit socket from the bidet for the shower? Its a slightly smaller pipe (40mm)
Starting from the top:
The sink waste is solvent welded but i can reuse it in its current position
I want to move the toilet to the adjacent wall so id need to move the branch through 90 degrees, can i just twist this round to the required position?
The bidet is being removed permanently
I want to run the shower waste under the floor boards.
The existing shower waste is solvent welded into the branch.
The bidet waste is push fit.
Can i cut an cap off the shower below floor board level and re-use the push fit socket from the bidet for the shower? Its a slightly smaller pipe (40mm)