With an internal stack that needs venting through the roof, it is usual to reduce down after the last 4inch branch in the pipe that goes in an upstairs toilet. What size do you usually reduce down to to take the soil pipe out through the roof? Think I have seen 3inch before do the readily sell this at plumbers merchants?