Hi everyone, I’m a kitchen/bathroom fitter and have a job coming up where the customer has had an extension built and added another bathroom which backs onto the existing bathroom.
the existing svp comes up in the corner of existing bathroom then runs horizontally to the toilet in a 1m high box section then up into loft
Planing on replacing the elbow where it comes up for a triple corner branch so I can run across to the new bathroom toilet (1.6m away) while also continuing to old toilet route.
Hope this makes sense, is there anything I need to be aware of?