Hi people, mind if I share a problem with you all?
Scenario is a restaurant with toilets on the lower ground floor, svp goes up to third floor offices and away into the roof somewhere. 2 cubicles and basins in ladies, 3 connected urinals and 1 cubical in gents. Problem is pans backing up and not clearing. I've seen the gents back up just by having clean cold water poured in from a bucket and thought the problem was air related. I checked with building control about placing a dirgo valve so low in the system and they ok'd it but apparantly it hasn't solved the problem. We've checked the horizontal soil pipe and its clean and appears to fall the right way, so can anyone scratch an idea off their forehead please?
Cheers
Chris
Scenario is a restaurant with toilets on the lower ground floor, svp goes up to third floor offices and away into the roof somewhere. 2 cubicles and basins in ladies, 3 connected urinals and 1 cubical in gents. Problem is pans backing up and not clearing. I've seen the gents back up just by having clean cold water poured in from a bucket and thought the problem was air related. I checked with building control about placing a dirgo valve so low in the system and they ok'd it but apparantly it hasn't solved the problem. We've checked the horizontal soil pipe and its clean and appears to fall the right way, so can anyone scratch an idea off their forehead please?
Cheers
Chris