[h=2]What are the requirements for a loft installation?[/h]Boiler installations in roof spaces should comply with the following additional requirements:- • Enough vertical clearance should be provided to satisfy the static head requirements for an
regular heat only system
• Fixed flooring should be provided under and around the boiler for servicing, also from the
entry point in the loft
• A permanent means of access to the roof space should be provided e.g fixed, retractable loft ladder
• Fixed lighting should be provided
• A guard should be provided to prevent contact between stored articles and the appliance
• The exit from the roof space should be provided with a guard rail to prevent anyone falling
• Isolation of gas, water and electricity should be possible without entering the roof space