- Messages
- 12
Hiya.Fitting a bathroom nxt week.There havin a shelf with a bowl on top & tap to the side fitted to shelf.The tap has flexi pipes to it which are around 300/500 mm long.Im running the feeds between the stud wall and was wondering which is the best way to connect the pipes,as i dont wanna fit the connect the flexis behind the wall,or is this acceptable(leaks)?...Or is it better to pin the flexis around the inside of the shelf unit and connect to feeds from wall under the shelf with isolators ?
Thanks for any help
Thanks for any help