I bought a house last year which had very inefficient electric heaters and no gas connection. The house price worked out cheaper even if I do all the works so I went ahead with it.
I now have a gas connection installed and am in the process of getting a full central heating system. The house has two-floors and contains three double bedrooms, kitchen, toilet, living room, hallway and landing.
I have received 04 quotes and am planning to go ahead with one of them based on the company's experience and cost. Posting the quote here for a sanity check to ensure everything is suitable for the size of my house and nothing is missing.
Total quote is for £4400.
Vaillant EcoTec Pro 24
10 Years Manufacturer’s Parts & Labour Warranty
Supply and fit Nest thermostat
Supply and fit standard flue
Full system chemical flush with ADEY MagnaCleanse
Supply and fit Adey MagnaClean Micro 2 filter
Installation of Inline Scale reducer
Refill heating system with Adey inhibitor
Carry out electrical works as required
Removal and Disposal of old boiler and related waste
Remove rubbish and leave site tidy and clean
Radiators - 7 radiators and one towel rail
Thermostatic Radiator Valves for all radiators
Additional pipework
Free of charge first annual service
Also, what documentation should I expect at the end of this install? I have read about the gas safe certificate only.
Thanks.
I now have a gas connection installed and am in the process of getting a full central heating system. The house has two-floors and contains three double bedrooms, kitchen, toilet, living room, hallway and landing.
I have received 04 quotes and am planning to go ahead with one of them based on the company's experience and cost. Posting the quote here for a sanity check to ensure everything is suitable for the size of my house and nothing is missing.
Total quote is for £4400.
Vaillant EcoTec Pro 24
10 Years Manufacturer’s Parts & Labour Warranty
Supply and fit Nest thermostat
Supply and fit standard flue
Full system chemical flush with ADEY MagnaCleanse
Supply and fit Adey MagnaClean Micro 2 filter
Installation of Inline Scale reducer
Refill heating system with Adey inhibitor
Carry out electrical works as required
Removal and Disposal of old boiler and related waste
Remove rubbish and leave site tidy and clean
Radiators - 7 radiators and one towel rail
Thermostatic Radiator Valves for all radiators
Additional pipework
Free of charge first annual service
Also, what documentation should I expect at the end of this install? I have read about the gas safe certificate only.
Thanks.