Ive now got to run a heating zone through a flat roof structure where the pipes will have to rise 300mm for 8m before dropping to a single rad using plastic pex pipe. Its obviously a sealed system but im worried about airlocks. Has anyone done something similar with no problems. What do you think? Any advice appreciated.