M
muddy waters
i'm considering fitting one of these. manufacturer's instructions state that filter should be mounted vertically and preferably on boiler return pipe and at least one metre from the boiler. due to layout of my system it's only practical to mount vertically on the ch flow pipe and about 250mm after the mid position valve (5 metres away from boiler). system would be flushed before installing filter. does this sound ok? thanks for any replies.