B
baldyb220
Hi guys,
looking for a bit of help. I have the above boiler and timer.Come home tonight and its all switched off and timer says 0 days left call eng. Now I have looked on the net and it needs a service.
I have only been here two months and previous tenant said service was done so took his word for it.
I'm looking to see if there is a temporary override til I get engineer out.
Thanks
looking for a bit of help. I have the above boiler and timer.Come home tonight and its all switched off and timer says 0 days left call eng. Now I have looked on the net and it needs a service.
I have only been here two months and previous tenant said service was done so took his word for it.
I'm looking to see if there is a temporary override til I get engineer out.
Thanks