M
mickqc
went to price a job. the existing shower and 4 body was a working off a pressurised system.
the tray was quite deep about 75mm and 1400 x 800mm.
They could not use the body jets and even with just the head on the tray filled and overflowed.
I have priced for fitting a standard low profile tray with a 90mm waste and 50mm fast flow waste and pipework. I will be running the pipework straight out with maybe one sweeping bend bossed into the soil stack.
they are keeping the existing shower and body jets.
It looks like the old system T`d into the 1 1/4 basin waste.
will this be enough to stop the tray overflowing.
thanks for help..
the tray was quite deep about 75mm and 1400 x 800mm.
They could not use the body jets and even with just the head on the tray filled and overflowed.
I have priced for fitting a standard low profile tray with a 90mm waste and 50mm fast flow waste and pipework. I will be running the pipework straight out with maybe one sweeping bend bossed into the soil stack.
they are keeping the existing shower and body jets.
It looks like the old system T`d into the 1 1/4 basin waste.
will this be enough to stop the tray overflowing.
thanks for help..