Shower tray installation | Showers and Wetrooms Advice | Plumbers Forums
  • Welcome to PlumbersTalk.net

    Welcome to Plumbers' Talk | The new domain for UKPF / Plumbers Forums. Login with your existing details they should all work fine. Please checkout the PT Updates Forum

Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

American Visitor?

Hey friend, we're detecting that you're an American visitor and want to thank you for coming to PlumbersTalk.net - Here is a link to the American Plumbing Forum. Though if you post in any other forum from your computer / phone it'll be marked with a little american flag so that other users can help from your neck of the woods. We hope this helps. And thanks once again.

Discuss Shower tray installation in the Showers and Wetrooms Advice area at Plumbers Forums

Messages
120
Im coming up with mixed information on how to correctly fit my shower tray.

Its a steel framed, acrylic capped shower tray from crosswater like this

The underside of the tray is flat, and has several circles marked out in black marker, which i believe are the load points locations for riser legs

I'll be fitting it directly onto a 22mm chipboard floor so no riser kit for me.

The question is should i be bedding the tray into a bed of mortar/adhesive or should i be bonding the tray directly to the floor with CT1/OB1 or some type of adhesive sealant?

I've found guides/videos where people do both so not sure which is best/correct
 
Nope, just a sheet with a diagram showing the shower dimensions, thats all.

unfortunately crosswater dont seem to be very good at supplying thorough instructions im my experience

I fitted one of their shower valves a few weeks back and the instructions for that were pretty bad. Lots of mistakes and missing info. Probably not a problem for professional bathroom fitters/plumbers
But if you're doing it diy it's always reassuring to know that you didn't make any errors that might come back to bite you once everything is fitted
 
Last edited:
Upvote 0
We always bed our trays down with a flexible tile adhesive. Clean both surfaces, prime and make a thin bed of adhesive across the whole tray area, normally a 5mm trowl does the job, assuming your floor is level.
Leave for 24hrs and it should be solid as a rock. Just check floor and tray are level before you fit, we've come across loads of twisted trays recently.
 
Upvote 0
Im coming up with mixed information on how to correctly fit my shower tray.

Its a steel framed, acrylic capped shower tray from crosswater like this

The underside of the tray is flat, and has several circles marked out in black marker, which i believe are the load points locations for riser legs

I'll be fitting it directly onto a 22mm chipboard floor so no riser kit for me.

The question is should i be bedding the tray into a bed of mortar/adhesive or should i be bonding the tray directly to the floor with CT1/OB1 or some type of adhesive sealant?

I've found guides/videos where people do both so not sure which is best/correct
What do the manufacturers instructions suggest? Don’t particularly see an advantage to either method, as both are used.
 
Upvote 0

Similar plumbing topics

  • Question
Depends on the tray and if there’s big voids...
Replies
3
Views
2K
  • Question
As an update, what I did was: Applied a blob...
Replies
4
Views
727
  • Question
I'd use thermopanel tile backer insulation...
Replies
2
Views
2K
  • Question
Put a level on the floor and shim it up level...
Replies
12
Views
2K
  • Question
Install timbers instead of the crap legs
Replies
1
Views
1K
Back
Top