Hi Guys,
The next job on my list is sorting out this mess, where the soil stack meets gully:
From above, you can just about see that the (clay) gully is tight up against the wall, so is offset from the soil pipe centreline - which probably hasn't helped:
The connection has been made via some sort of flexible section, but it's now in poor condition
What's the best way to sort this out, assuming I don't want to move the gully! The stack is attached to the wall with standard clips:
Many thanks,
David