Sorting out ACS and starting gas work | Gas Engineers Forum | Plumbers Forums

Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

Discuss Sorting out ACS and starting gas work in the Gas Engineers Forum area at Plumbers Forums

Status
Not open for further replies.
J

JCSPLUMBING

As above I've finally bitten the bullet and going to do the gas side of the job. Of course I've done gas works previously "supervised" and as apprentice my old boss had me fitting boilers and cookers all the time. I'm pretty up to date with the gas stuff as I'm frequently working alongside gas safe blokes. I've just been too tight to fork out and do it. I'm doing the gas training with able skills in Kent then I'll complete the portfolio with a mate of mine who I work alongside often in exchange for beer I would of thought, knowing him. Also as I have NVQ level 2 and supervised gas work signed off my portfolio is quite a bit shorter. Anyone in the same boat?
 
Status
Not open for further replies.

Similar plumbing topics

Hi, I'm looking for a gas engineer who I can...
Replies
0
Views
668
Hi Boilermedic can help you with your...
Replies
7
Views
2K
Nedis Plug-In LPG, Natural Gas and Coal Gas...
Replies
10
Views
1K
I have connected the secondary pump to a wifi...
Replies
9
Views
2K
H
Hi there, thanks for your time to look at this...
Replies
0
Views
913
HRP123
H
Back
Top