U
Unregistered
I am having building work done at the moment. The person doing the plumbing is using speedfit connections for water and heating below floorboards, and connecting from old copper with a type of plastic pipe that connects via the speedfits. Is this normal these days, or should he be using copper below floors?
He has also put a connection(compression) joint below a block and beam ground floor.
None of this seems right to me.
He has also put a connection(compression) joint below a block and beam ground floor.
None of this seems right to me.