jonny5isalive

Plumbers Arms member
Plumber
Gas Engineer
Messages
320
As above i have a customer who wants to convert from one meter supplying six flats to six separate flats. As i understand it this is done by the energy provider. Any other options?

Their provider is extra energy. Spent two lots of 45 mins trying to get through to them and no joy so far. Grrrr.

Thanks for any advice.
 
If you've got your meter tickets, and commercial too, install 6 sub meters.

The landlord can set his own tariff then.
 
Ill see what he says. Student flats so im sure he'd love the money making implications. Just have to get my meter tickets.
 
I hope its got a large enough primary meter and not a u6 lol
 
Good point. Didnt look properly when i was there but i reckon its at least a u25. 2" gas pipe. Original idea was to get six separate supplies as i said before. Depends what the landlord wants really. And how much it will cost.
 
Good point. Didnt look properly when i was there but i reckon its at least a u25. 2" gas pipe. Original idea was to get six separate supplies as i said before. Depends what the landlord wants really. And how much it will cost.

if gas suppliers happy then go for it as long at main meter will cope with demand no problem
 
I assume theres allowance for refundancy or does main meter have to be able to cope with max load of secondary meters? Ie 6x6m3= 36m3. Actual load is only going to be 3m3 approx per flat and thats flat out.

Got ige docs so will look through when time
 
they will want to put 6 new meters outside the front of the building normally.
 
Original is in an outhouse on the side. Also is split across two properties as used to be a care home. Be interesting logistics to get all meters in there with original. May have to put them in their own external housings.
 
the pipe runs will be problaby be a problem aswell keeping them out of the other properties, etc..... fit leccy heater :)
 
They will be paying a pretty heafty standing charge for the big meter so it may be more cost effective to get the grid to fit seperate u6's
 
They will be paying a pretty heafty standing charge for the big meter so it may be more cost effective to get the grid to fit seperate u6's

Can you go straight to the grid or do you have to go through current supplier?
 
Usually straight to the grid for the new supplies then pick who you want the meter from. If they remove the big meter they will return it to whoever the supplier is.
 
Status
Not open for further replies.

Similar plumbing topics

What was his diagnosis and was he a commercial...
Replies
23
Views
2K
yes , the meter for the immersion heater. Not...
2
Replies
30
Views
7K
I have connected the secondary pump to a wifi...
Replies
9
Views
2K
H
Hi there, thanks for your time to look at this...
Replies
0
Views
912
HRP123
H
Basically sounds like nothing was set in stone...
Replies
21
Views
6K
Back
Top