Can I have some opinions on the following scenario?
I have been asked to quote for replacing a R/S non condensing boiler with a condensing combi boiler.
The gas supply pipework is fine for the size of the boiler, however the 22mm pipework passes through two brick walls and is not sleeved. At present this is NCS.
If I accept this work am I obliged to bring the gas supply pipework up to standard?
I have been asked to quote for replacing a R/S non condensing boiler with a condensing combi boiler.
The gas supply pipework is fine for the size of the boiler, however the 22mm pipework passes through two brick walls and is not sleeved. At present this is NCS.
If I accept this work am I obliged to bring the gas supply pipework up to standard?