Have been to quote this job.
extension under construction, builder wants boiler moved to wall at back in pictures. 615mm wide.
is this place suitable? Will a 12 ri be a good choice? How long would you allow?
i have to re route all the pipe work so it will be in the new ceiling, will need to extend the cables on the wiring centre and this will be in the ceiling too.
Remove some existing gas pipe and re-run in copper.
Horizontal flue.
Nowhere to run the condense was thinking soak away.