Taking forever to pressurise gravity fed system. Why is this? | Central Heating Forum | Plumbers Forums
  • Welcome to PlumbersTalk.net

    Welcome to Plumbers' Talk | The new domain for UKPF / Plumbers Forums. Login with your existing details they should all work fine. Please checkout the PT Updates Forum

Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

American Visitor?

Hey friend, we're detecting that you're an American visitor and want to thank you for coming to PlumbersTalk.net - Here is a link to the American Plumbing Forum. Though if you post in any other forum from your computer / phone it'll be marked with a little american flag so that other users can help from your neck of the woods. We hope this helps. And thanks once again.

Discuss Taking forever to pressurise gravity fed system. Why is this? in the Central Heating Forum area at Plumbers Forums

Messages
5
Hello,
I live in a two floor semi with a gravity fed conventional gas fired boiler (Potterton Kingfisher MF). The boiler is fed cold water from the loft water reservoir tank (which also feeds the cold water taps in the bathroom & the WC cistern). There is an expansion vessel attached to this cold water feed to the boiler (the boiler, circulation pump, and two 2-way motorised valves, one each for hot water and central heating, are in the kitchen on the ground floor). The expansion vessel and the hot water storage tank are in the airing cupboard on the first floor, directly overhead of the boiler.
There is a braided flexible connector hose between the flexible PVC cold water feed tubing from the loft tank to the airing cupboard AND the expansion tank. There are three shut off valves on this braided connection hose. There is a water pressure meter attached to the expansion vessel.
Each winter, just before the central heating is first switched on, the meter indicated water pressure, is between 0.6 to 0.8 bar. I open the three valves on the aforementioned braided flexible hose and wait until the meter shows 1.2 bar, turn off the valves and switch on the central heating at the programmer. There is no need to repressurise the system until the next winter. This system has been in service for 14 years now.
All was well until 10 years ago. Until then it took at 5 - 8 minutes to pressurise to 1.2 bar. But since then, it took ever increasing lengths of time to do so.
At the start of the current central heating season this year, it took 3 hours to increase the pressure from the 0.6 bar to the 1.2 bar required.
And also, now the central heating has started to cut out after being on for a couple of hours. A new circulation pump was installed 3 years ago, and last year I had to again get a plumber over when the boiler kept starting and stopping. The plumber replaced the motor head of the two way central heating motorised valve, and that fixed the problem.

So my question is: what is the most likely explanation for the long time it now takes to pressurise, and second: is this also the cause of the central heating cutting off? Many thanks in advance!
 
Last edited:

Similar plumbing topics

Everything working fine on PP mode - thanks...
Replies
7
Views
902
it is brand new ( 6 months old ) Worcester gas...
Replies
2
Views
681
losing pressure
L
Pin hole leak on suction side of pump.
Replies
1
Views
465
Thanks again for your help. Having got hold of...
Replies
11
Views
2K
Back
Top