Thermostatic Mixer Advice | UK Plumbers Forums | Plumbers Forums
  • Welcome to PlumbersTalk.net

    Welcome to Plumbers' Talk | The new domain for UKPF / Plumbers Forums. Login with your existing details they should all work fine. Please checkout the PT Updates Forum

Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

American Visitor?

Hey friend, we're detecting that you're an American visitor and want to thank you for coming to PlumbersTalk.net - Here is a link to the American Plumbing Forum. Though if you post in any other forum from your computer / phone it'll be marked with a little american flag so that other users can help from your neck of the woods. We hope this helps. And thanks once again.

Discuss Thermostatic Mixer Advice in the UK Plumbers Forums area at Plumbers Forums

Messages
49
Hello. Currently in the process of changing an electric shower into a thermostatic mixer shower, its a bit of a long story with the builder but the existing shower area was basically bodged in to fit and tiled over concealing a few of the builders hacks into the plasterboard walls and getting the bottom tray to fit, its been a bit of a PITA.

I have stripped this area back to the stud partitions and will be installing a thermostatic mixer shower. I have the existing cold feed already in place and will need to lift flooring to fit the hot feed, will install again in 15mm speedfit.

The question i ask is what parts do i need to purchase in order to secure the pipes firmly behind the stud wall in order to fit the mixer bar. Also do i need to fit non return valves to the hot and cold water feeds?
 
So you have a mains cold feed, how is your hot water supplied? If it’s unvented cylinder or Combi boiler then crack on, if you have gravity hot then wait for further advice.

If you are using a bar mixer valve then you can bring plain pipe out at 150 centres and secure the valve using a front fixing kit ( this is the easiest method). Put a piece of 18mm ply flush to the front of your studwork and drill 20mm maximum holes for your pipes, then you’ll have something to screw into.
Finish wall (tiles/ boarding) then drill right through this finish but not through the ply and attach fittings with stainless steel wood screws - it will never move and you could hang from it should you so wish.

As you’re using plastic pipe clip it to the studwork to stop it banging around when the valve is shut off.

The valve should have non/return valves built in at the hot/cold connections.
 
So you have a mains cold feed, how is your hot water supplied? If it’s unvented cylinder or Combi boiler then crack on, if you have gravity hot then wait for further advice.

If you are using a bar mixer valve then you can bring plain pipe out at 150 centres and secure the valve using a front fixing kit ( this is the easiest method). Put a piece of 18mm ply flush to the front of your studwork and drill 20mm maximum holes for your pipes, then you’ll have something to screw into.
Finish wall (tiles/ boarding) then drill right through this finish but not through the ply and attach fittings with stainless steel wood screws - it will never move and you could hang from it should you so wish.

As you’re using plastic pipe clip it to the studwork to stop it banging around when the valve is shut off.

The valve should have non/return valves built in at the hot/cold connections.


The system is on a Combi boiler, was thinking of half copper using the Marflow PL8 and then fixing the speedfit onto the copper work which would give a nice sturdy fix. Does this sound alright?
 
As Ben-Gee quite rightly points out it is important to know if you have a high or low pressure hot water system. As the the hot & cold feeds need to be balanced.

The system operates just over 1 bar. The boiler is fed direct from mains pressure. The bath tap is also a thermostatic mixer tap and the feed for the shower would come directly off this.
 
Last edited:
Yes you are good to go i have used this bracket i would advise you use 15mm copper pipe and adapt to speed fit where appropriate ,well bracketed pipework is a must ,balanced supplies , isolation valves accessible of course, one other thing i would say is fix the plate to a piece of ply set it back in the stud work at least by 25mm before any boarding is fixed and test the first fix before hand best of luck. kop
 

Attachments

  • Screenshot_20200902-074632_Chrome.jpg
    Screenshot_20200902-074632_Chrome.jpg
    99.5 KB · Views: 16

Similar plumbing topics

L
  • Question
Please check the problematic faucets after...
Replies
11
Views
3K
  • Question
I imagine any mixer valve or tap could limit...
Replies
3
Views
1K
Have you got a photo of the sink at the...
Replies
2
Views
546
  • Question
You can do it but it’s not going to look the...
Replies
6
Views
2K
  • Question
Thanks Any thoughts on a shower system to...
Replies
4
Views
813
Back
Top