Hi i am renovating a bungalow we have installed a new central heating system. long and short of the story in the shower area my plumbers installed a chrome flat towel rail, which we piped from above so basically the towel rail is upside down.
We did this as walls are paramount egg box and didn't want pipes coming through cappuccino marble
No air in system (manual Bleed in loft) but the towel rail only gets hot 2/3rd from top down any ideas? my plumber says has installed this way before no probs. We got hot when commissioning by basically bleeding water from bleed vale until hot then topping up system.
System combi valliant ecotec 24
We did this as walls are paramount egg box and didn't want pipes coming through cappuccino marble
No air in system (manual Bleed in loft) but the towel rail only gets hot 2/3rd from top down any ideas? my plumber says has installed this way before no probs. We got hot when commissioning by basically bleeding water from bleed vale until hot then topping up system.
System combi valliant ecotec 24