Twin flue options | Plumbing Jobs | The Job-board | Plumbers Forums
  • Welcome to PlumbersTalk.net

    Welcome to Plumbers' Talk | The new domain for UKPF / Plumbers Forums. Login with your existing details they should all work fine. Please checkout the PT Updates Forum

Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

American Visitor?

Hey friend, we're detecting that you're an American visitor and want to thank you for coming to PlumbersTalk.net - Here is a link to the American Plumbing Forum. Though if you post in any other forum from your computer / phone it'll be marked with a little american flag so that other users can help from your neck of the woods. We hope this helps. And thanks once again.

Discuss Twin flue options in the Plumbing Jobs | The Job-board area at Plumbers Forums

Status
Not open for further replies.

GQuigley67

Plumbers Arms member
Plumber
Gas Engineer
Messages
5,073
Evening folks

got a boiler replacement starting next week, existing boiler vokera with twin flue system, not sure how long the flue run is I would say around 6m or so, not had a proper measurement yet.

Customer wants worcester 30si, their vertical is max 6m.

If if is over 6m, what other options do I have? (Decent boiler not tat)

Changing boiler location not possible.
 
up it to 80/125 then your max is 15m
 
29 cdi classic can do 7.9m horizontal or 9.4m vert.
Deduct 1.5m for every 90º and 0.75m for every 45º
Will work out cheaper than using 5" flue

Btw water output is the same 11l/m
 
Last edited by a moderator:
Status
Not open for further replies.

Similar plumbing topics

The condensate pipe might be sharing the drain...
Replies
2
Views
890
Billy Boiler
B
  • Locked
keston are alright, theyre basicly an ideal...
Replies
8
Views
257
It's not easy, house is also a HMO so makes...
Replies
2
Views
1K
@ShaunCorbs - the heating engineer who will be...
Replies
6
Views
916
  • Locked
I fitted a Keston when working for a previous...
Replies
7
Views
118
Back
Top