The (rather sparse) manual with the controller that was supplied with my UFH (Hettaj describes the start sequence as - when demanded by the stat - valves open then pump runs.
As the programmability of the stat is very basic, I’d like to replace it with a smart controller the same as I use on rest of CH rads, (Netatmo) which “learns” how quickly the area or building heats up and turns on the heating in advance of the programmed time so that the desired temp is achieved by that time, also compensating for external temperature.
the only problem is that it is basically just a make/break switch so if I installed this then the UFH pump would start before the valves had opened. (Triple circuit in one open plan room, all 3 run or none, so they are wired in parallel.Is there a bypass in the pump (Grundfoss) or is it harmless for pump to run against valves for short while that they take to open?
the other option is to wire valves so they remain open when pump is off - bad idea?
or a different controller altogeth…
advice and suggestions welcomed. Thanks
As the programmability of the stat is very basic, I’d like to replace it with a smart controller the same as I use on rest of CH rads, (Netatmo) which “learns” how quickly the area or building heats up and turns on the heating in advance of the programmed time so that the desired temp is achieved by that time, also compensating for external temperature.
the only problem is that it is basically just a make/break switch so if I installed this then the UFH pump would start before the valves had opened. (Triple circuit in one open plan room, all 3 run or none, so they are wired in parallel.Is there a bypass in the pump (Grundfoss) or is it harmless for pump to run against valves for short while that they take to open?
the other option is to wire valves so they remain open when pump is off - bad idea?
or a different controller altogeth…
advice and suggestions welcomed. Thanks