Hey friend, we're detecting that you're an American visitor and want to thank you for coming to PlumbersTalk.net - Here is a link to the American Plumbing Forum. Though if you post in any other forum from your computer / phone it'll be marked with a little american flag so that other users can help from your neck of the woods. We hope this helps. And thanks once again.

Discuss Underground drainage plans for building regs in the Ground Sourced Heat Pumps area at Plumbers Forums

Messages
34
About to submit some drainage plans to building regs so I was hoping that the wonderful people on here would give some views on what they would likely object to as it's easier to make changes before submitting than after.

Assuming the gradients are within spec does anything look out of place or could be simplified here? The shower/sink waste goes into a gully because I can't get the 450mm above the invert of the soil pipe to connect a boss to. Everything else in terms of inspection chambers etc is my interpretation of the regs so I'm sure I will have slipped up on something.

Waste at the very old property has been tested to confirm it is combined waste so I'm mixing surface and foul here. The pipe which runs under the building is an existing clay one and I've had a camera down it which showed no cracks or blockages.

Any advice much appreciated

04-foundations-drainage.jpg
 
They may want your rain and drain separate just warning you
 
They may want your rain and drain separate just warning you
Thanks Shaun. Fully prepared to have that discussion. What I think I have on my side is that:
  • As an 18th Century Listed Building adding a further drain under the property could risk the structural integrity of the building
  • The waste as it currently stands is combined and other parts of the drainage system already connect to the foul waste
  • The current arrangement discharges directly on to the pavement which would create a risk for the public in cold months

Having said that I'm fully at the mercy of the inspector on the day. Let's just hope they are pragmatic

proposed-location-from-above.JPG
 

Similar plumbing topics

Yes or as your first drawing but with an...
Replies
6
Views
2K
  • Locked
Personally I'm with ric, the extended part...
Replies
6
Views
2K
  • Locked
Having a Jimmy Saville moment then Ray?
Replies
10
Views
111
T
  • Locked
anyone ever used this Wunda stuff thats...
Replies
18
Views
277
Back
Top