About to submit some drainage plans to building regs so I was hoping that the wonderful people on here would give some views on what they would likely object to as it's easier to make changes before submitting than after.
Assuming the gradients are within spec does anything look out of place or could be simplified here? The shower/sink waste goes into a gully because I can't get the 450mm above the invert of the soil pipe to connect a boss to. Everything else in terms of inspection chambers etc is my interpretation of the regs so I'm sure I will have slipped up on something.
Waste at the very old property has been tested to confirm it is combined waste so I'm mixing surface and foul here. The pipe which runs under the building is an existing clay one and I've had a camera down it which showed no cracks or blockages.
Any advice much appreciated
Assuming the gradients are within spec does anything look out of place or could be simplified here? The shower/sink waste goes into a gully because I can't get the 450mm above the invert of the soil pipe to connect a boss to. Everything else in terms of inspection chambers etc is my interpretation of the regs so I'm sure I will have slipped up on something.
Waste at the very old property has been tested to confirm it is combined waste so I'm mixing surface and foul here. The pipe which runs under the building is an existing clay one and I've had a camera down it which showed no cracks or blockages.
Any advice much appreciated