W
white rabbit
Situation - Oil boiler (Firebird 150-180) situated in a large barn, running 8 heat exchangers that provide heat for large ponds. Can I run 22mm pipe under the ground somehow to provide heat for a larger pond in another building? The heat output and the heat exchangers have been calculated and the boiler can provide the heat, it is just getting the pipes from one barn to another building? Any ideas? Special sleeving? Insulation? Depth? Cheers.
white rabbit
white rabbit