Been called out to look at a couple of these today as LA Bldg Control have said they wont sign off until the discharge from it incorporates an HEP V O Valve.
Can understand what there saying even though its 15mm discharge has been run into a vertical piece of 32mm waste pipe, siliconed at the top then drops into a P Trap and off to ??
Problem I see is that I cant see no T & P Valve, no Tundish and the discharge is from some kind of chrome tee that has the 15mm pipe stuck to it with insulation tape wrapped around it.
Has anyone come across these before? Bulgarian product.
Can understand what there saying even though its 15mm discharge has been run into a vertical piece of 32mm waste pipe, siliconed at the top then drops into a P Trap and off to ??
Problem I see is that I cant see no T & P Valve, no Tundish and the discharge is from some kind of chrome tee that has the 15mm pipe stuck to it with insulation tape wrapped around it.
Has anyone come across these before? Bulgarian product.