- Messages
- 4,293
Hi guys. I been to a job today to look at some work. It has had a recent inatall (not by me) WITH an unvented CYL with heat only boiler etc. Connected using a S plan with 2 two port valve all standard stuff. There was no high limit 2 port valve for the cylinder which would mean there should be 3 two port valves. is this allowed? I thought not but the install is very good and all document there with it so its not DIY