- Messages
- 11
Hi, just went to swap the first of three imperial sized rads (750 wide by 500mm) to a metric 700*500 double convector and like a Doyle have found I didn't plan for the copper pipe to be another 10/15 mm in from the wall to meet with valve.
Before I go ripping up floor boards, what will be the easiest way to bring them out from the wall. There's alot of play in the pipes as it's a 60s bungalow sitting on a suspended floor, but don't think I should be pulling the copper pipes about.
Any advice is greatly appreciated
Cheers
Martin
Before I go ripping up floor boards, what will be the easiest way to bring them out from the wall. There's alot of play in the pipes as it's a 60s bungalow sitting on a suspended floor, but don't think I should be pulling the copper pipes about.
Any advice is greatly appreciated
Cheers
Martin