Vertical rads | Plumbing Jobs | The Job-board | Plumbers Forums
  • Welcome to PlumbersTalk.net

    Welcome to Plumbers' Talk | The new domain for UKPF / Plumbers Forums. Login with your existing details they should all work fine. Please checkout the PT Updates Forum

Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

American Visitor?

Hey friend, we're detecting that you're an American visitor and want to thank you for coming to PlumbersTalk.net - Here is a link to the American Plumbing Forum. Though if you post in any other forum from your computer / phone it'll be marked with a little american flag so that other users can help from your neck of the woods. We hope this helps. And thanks once again.

Discuss Vertical rads in the Plumbing Jobs | The Job-board area at Plumbers Forums

Status
Not open for further replies.

jaydebruyne

Plumbers Arms member
Plumber
Gas Engineer
Messages
2,718
I've never fitted a vertical rad yet but will be doing so on Saturday. .

I've done a little research and know it's important to pipe up the flow on the correct side of the rad so it flows through the entire rad and not just the outside.

My question is this:

Say the flow is on the left, can you rotate the rad 180 degrees so flow is on the right? Are the diverter plugs on the same opposite sides?

Cheers
 
Yes mate, ther rad won't know which way it's facing:cool3:
 
it depends on the rad, some you can change but some have the brackets made into the back so have to be hung as made.
 
it depends on the rad, some you can change but some have the brackets made into the back so have to be hung as made.
Oh pooh! I'll have to give the mi's a glance then
 
some have a "straw" to direct the water to the to p of the rad which you can change to whichever side is the flow.
 
some have a "straw" to direct the water to the to p of the rad which you can change to whichever side is the flow.
I'm hoping so.. guess I'll find out Saturday ;) at least I'm a little more clued up now - cheers guys!
 
If doing pipework to vertical rads all, from scratch, tee off from 22mm and not too long 15mm runs.
The TRVs are very restrictive for vertical rads as the flow needs to be decent
 
If doing pipework to vertical rads all, from scratch, tee off from 22mm and not too long 15mm runs.
The TRVs are very restrictive for vertical rads as the flow needs to be decent
Custard decided he didn't want to take up floor tiles so just extending the 15mm. You reckon it's gonna be an issue then? Think I'm extending it by about 1.5m
 
Custard decided he didn't want to take up floor tiles so just extending the 15mm. You reckon it's gonna be an issue then? Think I'm extending it by about 1.5m

No problem really. If the customer says pipes can't be altered then you can't do it.
I just meant every large vertical rad seem to need to be taken off the 22mm if possible.
As long as it isn't done like one job I come across, - 4 large vertical rads and I think all off the one set of 15mm pipes all buried in screed. Builder job obviously and doesn't really work.
 
No problem really. If the customer says pipes can't be altered then you can't do it.
I just meant every large vertical rad seem to need to be taken off the 22mm if possible.
As long as it isn't done like one job I come across, - 4 large vertical rads and I think all off the one set of 15mm pipes all buried in screed. Builder job obviously and doesn't really work.
I'll see tomorrow.. could I not go up to 22 from the floor to underneath the rad and then back to 15, or would the bottleneck make it pointless? Most of the pipework will be hidden behind cabinets anyway
 
I'll see tomorrow.. could I not go up to 22 from the floor to underneath the rad and then back to 15, or would the bottleneck make it pointless? Most of the pipework will be hidden behind cabinets anyway

No, just ignore me, - I was only meaning try to pipe any new piped jobs with 15mm rad pipes coming off the 22mm main runs. 15mm will easily do one big rad. Just don't want to come off 15mm pipes that are already overloaded doing another rad or sometimes several.
I tend to pipe any large rads with 15mm teed each from directly 22mm anyhow.
 
No, just ignore me, - I was only meaning try to pipe any new piped jobs with 15mm rad pipes coming off the 22mm main runs. 15mm will easily do one big rad. Just don't want to come off 15mm pipes that are already overloaded doing another rad or sometimes several.
I tend to pipe any large rads with 15mm teed each from directly 22mm anyhow.
Okie dokes cheers best! ;)
 
Did the rad yesterday, was about 3m from original pipework, but tested and all heated up lovely.. :)

a1e68f62ac86ec7585270f774550a2aa.jpg
 
No, all sides were identical just straight through with holes to the columns

Could you see straight through from one side to another ?

and jay where's the clips ??
 
Behind the fridge ;) yeah straight through

Should of done the valves top bottom opposite ends else it could short circuit eg go straight down the return and doesn't matter
 
Last edited:
Should of done the valves top bottom opposite ends else it could short circuit eg go straight down the return and doesn't matter
Ohhhhhh ok I didn't think of that.. just assumed it would push through the columns regardless...
 
Surprising it didn't have a deflector baffle to steer the flow to top of rad.
If it works fast, then happy days
 
Surprising it didn't have a deflector baffle to steer the flow to top of rad.
If it works fast, then happy days

Was thinking the same thing, fitted a Hudson Reed one that was a right pig with no baffle, had to pay extra for one!!
 
Hmmm, I'm thinking I've messed it up now.. it didn't heat up extremely fast but I put that down to all the crappie in their system as neither did the original rad. Popped to screwfix was back in half hour and it was up to full temp all over. Worst case scenario when I flush their system in a couple months I can just put the flow at the top left. You live and learn as Shaun says ;)
 
Status
Not open for further replies.

Similar plumbing topics

Thanks guys. Just finished and managed to set...
Replies
9
Views
2K
  • Question
'Have tried all off bar A, B, and C, so not...
Replies
3
Views
812
As long as your flow pipe is getting hot first...
Replies
5
Views
1K
Thanks, I shall take a look in that case and...
Replies
21
Views
3K
  • Question
Just use a compression elbow, we wont tell.
Replies
14
Views
1K
Back
Top