Hi guys, been mulling over a job for the last week or so and not sure how much to charge.
takin out an old floor standing ideal thing which is located in the kitchen to put a new combi (halstead dimplex i beleive,38kw, are these anygood...never seen one before!) in the airing cupboard in the bathroom which might i also add is boxed in and is above a stairwell so the boiler will just about go into the space which will be left over when cylinder is took out.
Now the flippin guy is insisting that none of the boxing in will need to be removed as it will mess up his bathroom(understandable i suppose) i know its gonna be a struggle to pipe up but is do-able.
Also gotta run a new gas feed upto the boiler in 28mm which will follow the route of goin through a wall into a covered walkway and up through a flat roof and into the boiler location...and the gas meter is under a stairwell....and is just accessible enough to pass gas safe criteria.
I know he has been let down by 2 other fitters as they said the boxing in will have to come out!!
so you can see my predicament and it's gonna be a challenge and i know i'll get it done it's just a matter of how much to charge?? only supplying pipe and stuff as guy is gettin boiler and accessories.
could be 2 days on the job.....ive already been there and changed all rads so wont need a powerflush,just a chemical one.
takin out an old floor standing ideal thing which is located in the kitchen to put a new combi (halstead dimplex i beleive,38kw, are these anygood...never seen one before!) in the airing cupboard in the bathroom which might i also add is boxed in and is above a stairwell so the boiler will just about go into the space which will be left over when cylinder is took out.
Now the flippin guy is insisting that none of the boxing in will need to be removed as it will mess up his bathroom(understandable i suppose) i know its gonna be a struggle to pipe up but is do-able.
Also gotta run a new gas feed upto the boiler in 28mm which will follow the route of goin through a wall into a covered walkway and up through a flat roof and into the boiler location...and the gas meter is under a stairwell....and is just accessible enough to pass gas safe criteria.
I know he has been let down by 2 other fitters as they said the boxing in will have to come out!!
so you can see my predicament and it's gonna be a challenge and i know i'll get it done it's just a matter of how much to charge?? only supplying pipe and stuff as guy is gettin boiler and accessories.
could be 2 days on the job.....ive already been there and changed all rads so wont need a powerflush,just a chemical one.