D
DanHunt
Hi all,
Am currently replacing my bathroom suite. The existing pipework was a mixture of copper and plastic pushfit and compression fittings. Much of it was old so i've taken the decision to replace copper parts with new plastic pushfit. When i've replaced the parts and connected up to the taps etc. and turned the water on i find both the hot and cold pipes will burst a joint somewhere, seemingly because of the pressure. Am i doing something really obviously wrong or is it a question of checking every joint again? Is there something i'm meant to do before i turn the mains water supply back on? All advice gratefully received.
Am currently replacing my bathroom suite. The existing pipework was a mixture of copper and plastic pushfit and compression fittings. Much of it was old so i've taken the decision to replace copper parts with new plastic pushfit. When i've replaced the parts and connected up to the taps etc. and turned the water on i find both the hot and cold pipes will burst a joint somewhere, seemingly because of the pressure. Am i doing something really obviously wrong or is it a question of checking every joint again? Is there something i'm meant to do before i turn the mains water supply back on? All advice gratefully received.