Hey guys
Ive carried out some rough calculations as to how much of my concrete floor I'll have to break out to fit a UFH system and I'm concerned about the amount of work involved and the number of skips I'll need and was wondering if I can reduce the amount of digging I need to do.
I was originally thinking of digging 270mm:
100mm concrete base
DPM
100mm PIR insulation board
70mm screed.
Is there any way I can skimp out on any of the above figures?
My kitchen is 2.4 x 3.1 m
if all goes well I want to Start digging my conservatory next.
Thanks again
Ive carried out some rough calculations as to how much of my concrete floor I'll have to break out to fit a UFH system and I'm concerned about the amount of work involved and the number of skips I'll need and was wondering if I can reduce the amount of digging I need to do.
I was originally thinking of digging 270mm:
100mm concrete base
DPM
100mm PIR insulation board
70mm screed.
Is there any way I can skimp out on any of the above figures?
My kitchen is 2.4 x 3.1 m
if all goes well I want to Start digging my conservatory next.
Thanks again