First things first, I've been watching Shannon for years but this is my first post.
So long story short, I've gotten in over my head with what started as a new toilet and supply line turned into gutting the whole bathroom. It's a half bath addition, absolutely nothing is code and there is so much water damage. I've pull the sheet vinyl and found rotted hard wood floors so I pulled those and found a huge hole and not as rotten wood slats, but still very wet.
The drywall is wet and moldy, gnats and smells galore, and I've been running 2 dehumidifiers around the clock in this tiny, tiny bathroom with minimal results.
How do I fix this? I was told to just dry it out and go over with plywood for a new floor but is it going to dry?
These people are on a very tight budget and I'm just doing this to help them out and to gain experience. But I want it to be right and look good, I don't do half bum jobs so somebody help a girl out with some real life experience with not your average bathroom.