I'm building a new house and want to know is there a standard location\ distance from walls that the soil pipe should come up. The pipe will take a WC on the GF and then stack up to the 1st floor to take the bathroom above and then up to vent tile so he'll need a couple of T connectors which usually have a boss adaptor on 3 sides. I'd like the boxing to be as narrow as possible but without snookering the plumber on his first fix and they can't be adjusted afterwards due to a gas membrance secured around the pipe before the pour of the floor.
I've attached a GF plan and the SVP's are shown.
Thanks in advance
I've attached a GF plan and the SVP's are shown.
Thanks in advance