Lay down the scene:
15yr old Worcester 28CDi hemed into upstairs airing cupboard with about 50mm to sides and 150mm below boiler.
One burst expansion vessel with no reasonable option to fit a remote replacement.
One replacement vessel ordered up.
About 4hrs after removing pump, plate heat exchanger, APS, fan, flue box, lifting main heat exchanger and a lot of pushing and pulling the new vessel was in. There was a few coffee breaks though so could have maybe cut time down a bit.
Nightmare job I dont wish to repeat. Could not have made it any more difficult if they tried!:censored:
15yr old Worcester 28CDi hemed into upstairs airing cupboard with about 50mm to sides and 150mm below boiler.
One burst expansion vessel with no reasonable option to fit a remote replacement.
One replacement vessel ordered up.
About 4hrs after removing pump, plate heat exchanger, APS, fan, flue box, lifting main heat exchanger and a lot of pushing and pulling the new vessel was in. There was a few coffee breaks though so could have maybe cut time down a bit.
Nightmare job I dont wish to repeat. Could not have made it any more difficult if they tried!:censored: