- Messages
- 647
Hi ,
Im in need of an OFTEC engineer to carry out an install of a 70Kw oil boiler, 2500Ltr bunded tank and oil line approx 20m. We are trying to talk the customer into moving the position of the boiler to allow for a balanced flue. It would need commissioning at a later date and OFTEC registration etc, garuntees etc. We are looking at starting the job in around 2 weeks depending on availability of materials, with a view to final commissioning possibly 2 weeks later.
Anyone interested please call Wayne on 07912179484 or
email me [email protected]
Im in need of an OFTEC engineer to carry out an install of a 70Kw oil boiler, 2500Ltr bunded tank and oil line approx 20m. We are trying to talk the customer into moving the position of the boiler to allow for a balanced flue. It would need commissioning at a later date and OFTEC registration etc, garuntees etc. We are looking at starting the job in around 2 weeks depending on availability of materials, with a view to final commissioning possibly 2 weeks later.
Anyone interested please call Wayne on 07912179484 or
email me [email protected]