- Messages
- 8,572
got a job which is nearly complete and i have the wiring to do .
i have 3 heating zones and the hot water , can i just wire them up
L N E to boiler and then from boiler to wire up two S plans one for ch upstairs one for down stairs and on the other
tower rails and hot water .
any suggestion how to wire it up
thank you
stan
i have 3 heating zones and the hot water , can i just wire them up
L N E to boiler and then from boiler to wire up two S plans one for ch upstairs one for down stairs and on the other
tower rails and hot water .
any suggestion how to wire it up
thank you
stan