B
Boondocker
Hi all, I am planning on moving one radiator to another wall in the living room and adding a further radiator as well. Pipework is buried in the floor screed. What's the best way of approaching this?
When I remove the existing rad I can probably trace the pipe run so that it can be cut out or capped if that's a better idea. I would still need to access pipework elsewhere to then add a new radiator at another point in the room.
What's the preferred method of creating a channel for the new pipework and does it have to comply with any building regs i.e. copper/plastic contained inside some kind of ducting?
Many thanks.
When I remove the existing rad I can probably trace the pipe run so that it can be cut out or capped if that's a better idea. I would still need to access pipework elsewhere to then add a new radiator at another point in the room.
What's the preferred method of creating a channel for the new pipework and does it have to comply with any building regs i.e. copper/plastic contained inside some kind of ducting?
Many thanks.