I,am first fixing a bathroom, and the customer is thinking a getting a air source heat pump with over size rads, but has been told by the installer that he can not use the old pipe work as it is 8mm to the rads and the ASHP can not cope and needs 28/22 flow and return.
Is this right? I have only read about them so any feed back would be nice.
Thank you in advance.
Is this right? I have only read about them so any feed back would be nice.
Thank you in advance.